Technical Parameter |
|
Max. Drilling Depth |
200m |
Drilling Hole Dia. |
90-315mm |
Working Pressure |
1.7-3.0Mpa |
Air Consumption |
17-35m3/min |
Drill Pipe Length |
3m |
Drill Pipe Dia. |
76mm/89mm |
Axial Pressure |
4T |
Lifting Force |
14T |
Lifting Speed |
2.5m/min |
Push Speed |
0.5-5m/min |
Fast lifting Speed |
35m/min |
Max.Rotation Torque |
4500-6500Nm |
Rotation Speed |
50-70r/min |
Working Hoist Lifting Force |
1.5T |
Mud Pump Flow Rate |
20L/min (optional) |
High Pressure Hydraulic Legs Stroke |
1.5m |
Drilling Efficiency |
10-35m/h |
Travel Speed |
2Km/h |
Grade ability |
30° |
Weight |
5.4T |
Dimension |
3.9x1.7x2.15m |
Diesel Engine |
77KW(Yuchai ) |
Application formation |
loose layer or bedding rock |
Drilling Method |
Top Hammer Hydraulic Rotating and feeding, Down the hole hammer or mud pump drilling |